Home Remodel in Olympia

We just completed a major home remodel.  This included moving the kitchen to the south side of the house, converting the existing kitchen to a girl’s bedroom, building two additions for an indoor pool and home gym, and remodeling the main bathroom.

blog remodel entry way double doorsblog remodel contemporary kitchen

blog remodel contemporary kitchen3blog remodel contemporary kitchen 2blog remodel bedroom

blog indoor pool gymblog indoor gym rock climbing wall

Advertisements

Designing your next project

http://www.wcontracting.net

Here are a couple pictures showing the transition of a fireplace remodel. We started with a simple sketch which showed the customer an idea of what we were going to do. Next, the work began with the demolition of the old faux brick paneling, installation and finishing of new drywall. We then installed new backer board where the slate would be installed and began setting the stone. We not only put the slate behind the fireplace but also across the front of the platform as well. With the stone inplace, we painted and installed the stained wood trim. I think this turned out great and the customer was extremely happy.

20110329-104126.jpg

20110329-101022.jpg

20110329-101033.jpg

20110329-101046.jpg

20110329-101056.jpg

20110329-101115.jpg

Project Complete – Kitchen and Living Room Remodel adds warmth and value to Des Moines home

Here are a couple photos from the completed remodel project we did in Des Moines. This project involved replacing the walls, ceiling, floors, countertops and base trim. We also redesigned the fire place area to make it the vocal point in the living space. The rock around the fireplace is a multi-colored slate with a stained hemlock wood trim wrap. The countertops are granite with a single slab cut and placed on the old table to match the rest of the kitchen countertops. All the walls and ceilings were removed and redone with new drywall and texture. The floors are a hickory laminate floating floor. There are also new light fixtures by the fireplace and in the kitchen. The changes on this house make it a warm, inviting and comfortable place to live. I know the new owner is very happy with these upgrades.

This slideshow requires JavaScript.

Bathroom Remodel – Tile Installation for the floor, tub surround and countertop.

Today we started a new project for a new customer. This project is a little unique in that we are finishing a remodel the home owner was hoping to do themselves and have finished a year ago. First we are finishing the wall, and ceiling drywall and applying a hand texture to match the rest of the house. Then we are installing a vanity, tiling the floor, around the tub, and the countertop. Posted here are a couple of before pictures, so you can get an idea of where we are starting from. One of the ways we can take care of customers is with our flexibility, we are willing to come in and complete projects that you have started but aren’t able to complete.